Sunday 11 August 2013

Termite Manage


Cavernous termites are the most unhelpful and regularly encountered kind of termite found during India. Although they nest in soil, cavernous termites can assault structures by building tubes that attach their nest to wood in structures. Termite food consists of roughage obtained from wood.
Preconstruction AntiTermite Action:
  •  To correctly treat for termites during pre structure, the area will need to have termiticides applied sometimes at similar stages giving 10 years assurance.
  •   The first step for pre-construction termite action is to pleasure the lump by treating with a termiticide obstacle.
  •    Sides & bottom exterior of the basis trenches or paragraph pits are treated with chemical mixture. The plinth area is treated. Small holes are made at standard intervals in every wall and filled with chemical mixture and closed lastly.
  •     The earth approximately the outside perimeter of the building is treated so as to put off the reinjection of termites from outside.

Post Construction AntiTermite Action:
  •               Radical DRILL-FILL-SEAL Anti Termite Action with 5 years assurance.
  •            Wall and Floor action: Holes of 12mm diameter, 24-30 inches apart will be drilled next to the internal connection at depth of 12''on the ground and 4” on the upper floors. Termiticide will be injected under heaviness to create obstruction against termites.
  •          Wooden Fixtures Action: Holes of 6mm diameter will be drilled at the bottom of wooden-fixtures such as window frames and doorframes and termiticide will be injected. This action is done on all floors. An oil-based termiticide will be sprayed on all the electrical points infested by the termites.
  •            Termite Tubes Treatment: Observable protection mud tubes are first sprayed and organize the termites.
  •            Exterior Perimeter Action: Trenching or drilling holes of 12mm diameter along the exterior walls of the building at depth of 1ft. will be carried out to generate a chemical barrier/killing field roughly the building. All the drilled holes will be sealed. If building is surrounded by garden, the action shall be carried out to soil too.



No comments:

Post a Comment